Colchester Drilling Photos 2021

Photos and maps from the 2021 Colchester drilling program

Vulcan Minerals Colchester property drilling locations
CL-21-01. 90.5-92.5 m. Representative mineralization in 28 m section averaging 1.58% Cu and 0.33 g/t Au.
CL-21-01. 105-108.5 m. Average of 3.19% Cu & 0.64 g/t Au.
CL-21-02: 79-79.5 m. 4.71% Zn & 1.81 g/t Au.